Wednesday, January 21, 2015

The Nursery: Part 3

In case you missed it, this was the last nursery update...

We are finally starting to see the light at the end of the tunnel-with both the nursery and this pregnancy!  Both will be done within two weeks, if not sooner. :)

Last weekend we bought the foam for the crib.  It's a super firm foam which will support the boys very well.  We found a local old-school re-upholstery shop in town which cuts full slabs of foam to any size you want, which is rare.  When we walked in it was like we entered a time warp.  It was great fun to watch this little old man hobbling around the super cramped shop, pulling huge slabs of foam out of the woodwork.  Upon leaving, we both agreed that it's exactly the kind of place we love to support and that we'd be back for sure when it's time to replace the cushions on our own bed.

The foam guy in his cramped little shop, cutting a large piece of foam to our specs.
Brian's been working so hard every weekend and after work to put the finishing touches on the construction.  It's turning out to be a little more tedious of a job than we initially thought, mainly because of time, but also because of the shape of the back cabin.  Nothing is square and because we have to think about 20 little fingers getting stuck in crevasses, Brian is being extra careful that everything fits exactly the way it should.  It's been hard for me to sit (literally) and watch him do all of the work.  But I keep reminding myself that I'm actually growing two babies, and that's hard work in itself.  I guess this is a good example of teamwork, right?


Last night Brian was able to cut the foam and install it into the crib.  First he used the insulation as a template to mark where he should cut:


And then, using an electric turkey knife which was bought specifically for this purpose, he made the cuts:

Like butta.
 

Incidentally, as a chef, I feel the need to tell you that this is the only time an electric knife should ever be used.  :)

Once everything was cut, he put the mattress in the crib and made the bed:



We're starting to try to figure out exactly where we want to put everything.  Placement is very important because its such a small space.  We're being very selective about how we decorate, too, as not to overwhelm the boys with a million different colors and patterns.  The wall below will be painted or covered in a neutral color, probably cream to match the fiberglass walls.  The cushion below was bought at IKEA in the as-is section and will be recovered to match the cover we're making for the seat cushion (which is made out of the same foam as the mattress).


The main colors will be green, white and blue, with pops of other colors that can be found in the jungle.  I can't wait until construction is done so we can get it completely decorated and ready for Jack and Bobby!

Thanks for following along with our progress!

1 comment:

Marilyn said...

I'm so excited for you. You are going to be amazing parents.